The Best Time to Run a Gas Line During Pool Construction
Timing is everything when installing a gas line for a pool. Running the gas line at the right stage of construction can prevent costly delays, reduce unnecessary trenching, and ensure seamless coordination with other trades. This guide will help pool builders optimize their gas line installation process.
1. Schedule Trenching Early to Avoid Costly Delays
✅ Plan the gas line layout before excavation begins to prevent conflicts with plumbing, electrical, or drainage systems
✅ Coordinate with the plumber and general contractor to ensure alignment with the construction timeline
✅ If possible, combine gas line trenching with other underground utilities to save on labor and excavation costs
2. Coordinate Early to Prevent Rework
One of the most expensive mistakes pool builders make is failing to plan the gas line in advance. To avoid this:
✅ Discuss the gas line route with your plumber before pouring concrete or finalizing hardscaping
✅ Confirm gas pressure availability at the meter before selecting pool heaters or fire features
✅ Ensure trench depth and routing meet code requirements to avoid re-digging later
3. The #1 Mistake That Increases Gas Line Costs
🚩 Not running the gas line before pouring decking or hardscaping is a costly mistake.
✅ If the gas line is an afterthought, it may require cutting through concrete or rerouting—both of which are expensive and time-consuming
✅ Always install conduit or sleeves (3” to be safe!) under hardscaping for future gas lines to prevent demolition later
4. Bundle Gas Work with Other Phases to Save Money
✅ During excavation: Lay gas piping alongside pool plumbing where possible to reduce trenching costs
✅ Before backfilling trenches: Inspect and pressure-test the gas line to avoid excavation delays
✅ Before final inspections: Verify all connections, shut-off valves, and regulator requirements to ensure compliance
Pool Builder Gas Line Timing Checklist
✅ Plan gas line routing before excavation begins
✅ Coordinate trenching with other underground utilities
✅ Confirm gas pressure availability before selecting equipment
✅ Ensure trench depth meets code before backfilling
✅ Run gas piping before pouring concrete or decking
✅ Schedule inspections before finalizing the pool area
✅ Work with a licensed plumber to ensure compliance
Want expert guidance on timing your gas line installation? Contact Wildflower Plumbing & Gas at (512) 292-1966 or email info@wildflowerplumbing.com for seamless pool plumbing solutions!